The drainage line and tiling work has started but remains incomplete. Tiles have been laid only on one side, leaving the other side unfinished—this has created an uneven surface (up and down). As a result, rainwater is pooling around people's houses. Please prioritize completion of the tiling on the remaining side and ensure the surface is level to prevent water accumulation.